MAIN ACTIONS
The drafting of the construction project for the elimination of chemical pollution at the Flix (Tarragona) reservoir, urgent work approved by Royal Decree 2/2004.
Management of work to implement an automatic hydrological information system in the Duero River basin. Municipal Areas. Several.
A pilot study for the integration of the meteorological forecast into the management modules of the supply system.
The study and drafting of alternatives and basic technical specifications regarding the work on modernising large infrastructures for the transport and distribution of water.
Marking the boundaries of a stretch of the River Carrión in the area of Guardo (Palencia) in the Duero basin. Boundary Project 3rd Phase. Municipal Areas. Several (Palencia).
Drafting of the bid for the construction work on the new port installations at Punta Langosteira (Corunna).
Assessment and assistance for the processing, registration and checking of the exploitation in la section A of the water register in the Northern Hydrographical Basin (provinces of Lugo, Orense and Pontevedra). The Alberca Programme.
Execution of the work on the updating of the technical dossier of the Cazalegas dam, with is execution, surveillance and conservation norms. Municipal Area of Cazalegas (Toledo).
The forecasting of flooding and the alarm system in the basin of the Yellow River Amarillo, from Xiaolangdi to Huayuankou.
The preliminary study for solutions to the problems of thee Arroyo Salado de Porcuna in the area of the Roman Bridge at Villa del Río (Cordoba).
Work on the creation of the technical dossiers of the dams of Finisterre and El Castro on the River Algodor and the dam of Guajaraz on the same river with the drafting of the operating, surveillance and conservation norms. Municipal Area of Tembleque and others (Toledo).
Technical assistance for the drafting of the norms for the operation of the dams of Manzanares El Real, Pedrezuela, El Pontón de la Oliva, El Vado and El Pozo de los Ramos.
Technical assistance for the drafting of the norms for the operation of the dams of Navacerrada, Navalmedio, La Jarosa, Las Nieves and Valmayor.
Analysis of the real and theoretical quality of the fluvial resources in order to specify which waste water purifying plants must incorporate advanced treatment before the first milestone of the Plan and the order of implementation.
Integral Quality Plan for the Waters of the Tagus Basin.
Drafting of the project for the defence of the right bank of the River Guadalquivir. Municipal Area of Puebla del Río (Seville).
Drafting of the Norms for the Operation of the Dams of Pinilla, Riosequillo, Puentes Viejas, El Villar and El Atazar.
The study and drafting of the Norms for the Operation, Emergency Plan, updating of the XYZT Document and detailed checking of the dams of Mediano, El Gado, Barasona, Vadiello, Guara, Torrollón and Valdabra (Huesca).
Project for the repair of damage to the canal of La Minilla (wells 1 to 92. First phase).
The study of minimum seasonal clearance in the reservoirs of the dams of the supply system of the Canal de Isabel II.
Definition of the criteria and the methodology applicable to the classification of the dams depending on the potential risk and the technical analysis of the classification proposals.
The study of the environmental impact and the management of the procedure for evaluating the environmental impact of the new highway between Tordesillas and Zamora.
The study of the environmental impact and the management of the procedure for evaluating the environmental impact of the new highway between Ávila and Salamanca.
The project for conditioning the River Guadarrama.
The establishment of thee bases for a system of assistance to the management of clearance and releasing in the dams of the Canal de Isabel II.
The project for the conditioning of the River Chico in Avila.
The project for the conditioning of the River Gallo as it passes Molina de Aragon (Guadalajara).
The White Paper on the natural resources of the province of Cabo Delgado (Mozambique).
The Tagus Hydrological Plan. The study of quality objectives and treatment policies.
Computerising spills and catchments for drinking water in the Tagus Basin.
The project for supplying water to the Marina Alta (Alicante) by catchments in Vall de Gallinera.
The study and diagnosis of the pollution problems in the Wine Industries Sector.
Quality control of water in the River Tagus at low water.
The hydraulic study of the down river effects of possible failures in the structures for the regulation of the Canal de Isabel II.
The project for the environmental conditioning and recuperation of the basin of the River Jarama.
